Winter is approaching, how to solve the freezing problem of the constant temperature and humidity box in winter?

Winter is approaching, how to solve the freezing problem of the constant temperature and humidity box in winter?

How to solve the problem of cold climatic chamber Aisi Lai winter? After the Chung Yeung Festival has passed, the weather is getting colder, and people have measures to keep warm. So how does Ai Sirong's constant temperature and humidity box freeze in the winter? Here are our engineers' detailed introduction.

 

Constant temperature and humidity box insulation ()

First, the selection of measures with insulation device type instrument.

(1) According to the type application of the instrument and the location to be installed, propose the insulation and antifreeze requirements of the instrument, and submit it to the manufacturer for disposal.

(2) There is a temperature difference between day and night in some places in the north, which can reach more than -20 degrees at night. If the solution is selected, the price/performance ratio is quite uneconomical.

     

Second, insulation measures with insulation material insulation

(1) Immediately use insulation to wrap the instrument in parts that are susceptible to freezing or freezing.

(2) During the winter, inspections should be carried out and the sewage should be drained frequently to prevent the insulation of the packaging from being damaged.

    

Third, heat tracing measures ()

(1) steam heating measures that use pipe steam heating insulation. Before steaming in winter, check whether the steam insulation pipe is open or blocked.

(2) Insulation protection box measures

(3) Electric heating zone measures: The electric heating thermal insulation technology is a new type of heating technology that converts electricity directly into heat energy. Install insulation cables, wind the cable around the meter, or stick it inside the meter cabinet (but pay attention to the length of the heating cable used, to be economically modest).

 

Constant temperature and humidity box maintenance measures

 

(1) Installation measures Reasonable choice Installation location: Dry, free of rain and snow.

(2) Check-up measures When the conditions are met, the hand-over technician will perform technical confirmation and technical disposal of the insulation material on a daily basis whether it is damaged or whether the steam pipeline is clogged.

(3) Alarm measures The conditional sound and light alarm devices that can be installed with steam leakage or power-off status can be used to facilitate the discovery and timely remediation of the hidden dangers of heat preservation and antifreeze measures.

(4) The patrol measures are periodically inspected by the responsible area maintenance personnel according to the scheduled inspection route.

(5) During the inspection, it is necessary to check whether the insulation pipeline valve is normal, whether the insulation box is normal, whether the hydrophobic device is normal, whether the insulation material packaging is intact, and whether the electric heating power supply components are normal.

 

How to solve the problem of cold climatic chamber Aisi Lai winter? Through the above introduction, the user of Ai Siqi constant temperature and humidity box should already know how to protect it in the winter! If there are other questions, you can contact our engineers at any time and we will serve you wholeheartedly!

Hexagonal Wire Mesh

Hexagonal Wire Mesh,Hexagonal Wire Netting,Pvc Hexagonal Netting,Galvanized Hexagonal Fencing

Anping Chuangqian Wire Mesh Co., Ltd , https://www.apcqwiremesh.com