15ml 30ml 50ml Silver Acrylic Cosmetic Airless Pump Bottle

Surface Treatment: Painting, Hot Stamping, Silk-Screening
Size: Customized
Packing: Good Cartons with Blocks, Shrinking Film&Pallet
Loading Port: Ningbo Port
OEM&ODM: Yes, Custom Order Is Welcome
Price Terms: EXW, Fob, CIF, DDU, DDP
Samples: Available
Lead-Time: About 50 Days After Receiving Despoit
Trademark: C-PASSEN
Transport Package: Carton
Specification: 15ml, 30ml, 50ml
Origin: Ningbo
HS Code: 3923300000
15ml 30ml 50ml Silver Acrylic Cosmetic Airless Pump Bottle

Product Description:
 
1.Various sizes available, customized as per your request

2. Attractive and appealing surface treatments

(1)Color painting
(2)Hot stamping
(3)Frosting
(4)Silkscreen printing

3.Professional packing

Customization Process:

1st Step: Please advise your requirements.
2ndStep: We try to understand the conception and pattern from you with sample draft or refer picture.
3st Step: Offer the quotation after confirm the design, material and surface treatment.
4st Step: Made the sample for approval.
5st Step: Arrange production after deposit received.
6st Step: Arrange shipment after receiving final payment.
7st Step: The goods are shipped.
8st Step: You receive the goods.


Our Services:

1) We promise our company will provide best service and real competitive price to you for our cooperation.
2) Your email can be replyed within 12 hours .
3) After receiving the goods, pls contact us if there is any problem.
Remark: The price will be adjusted by kinds of causes, like surface cover...


Regular FAQ:

Q: How to get a quotation and start business relationship with your company?
A: Please send us email and our sales representive will contact you as soon as we receive your email.

Q: How to receive a price quotaion in the shortest time?
A: When you send us an enquiry, please kindly make sure all the details, such as model no , product size, and tube lenth, color , order quantity . We will send you quota with complete details soon .

Q: How to start a custom project with your company?
A: Please send us your design drawings or original samples so that we can offer a quotation first. If all details are confirmed, we will arrange the sample making once received your deposit .

Q: What's your MOQ?
A: The MOQ depends on the design and production processes of the products. Nomal our company MOQ is 10000pc , but like cosmetic bottle, it's MOQ is 5000pc

Q:How long can I receive an order?
A: That depends on the specific items and your order quantity. Normally, the lead time for a 20ft container load will be within 30 days

If you are interested in our product, welcome to contact us any time. We'll be honored to build long-standing business relationship with every client, will do our best to satisfy your requirements!

Contact Us:

Miss Summer
TEL: 0086-574-62738027
CELL: 0086-15058431255
ADD.: Room 1802, South building, Heli Towers, No.328 South Nanlei Road, 315400, Yuyao City, Zhejiang Province, China
 

Ground Earth Anchor

Ground earth anchors can be divided into anchor piles, anchor points, anchor ingots, and drag pits. In lifting operations, ground anchors are commonly used to fix drag ropes, cable wind ropes, hoists, guide pulleys, etc., ground anchors are generally prefabricated with steel wire ropes, steel pipes, and reinforced concrete Buried pieces, logs, etc. are made by burying them in the ground.


1. The ground Earth anchors used for hoisting should be made strictly according to the design, and concealed engineering records should be kept, and overloading is not allowed when using;


2. The ground anchor pit should be dug into a right-angled trapezoid shape, and the angle between the slope and the vertical should be 150 degrees. The anchor depth is determined according to the comprehensive situation of the site;


3. The angle between the drag rope and the horizontal plane is generally less than 30 degrees. The exit point of the ground anchor foundation pit (that is, the place where the wire rope passes through the soil layer and exposes the ground) is 2.5 times the depth of the front pit and within 2 meters on both sides of the foundation pit. No trenches, cables, underground pipelines and other structures, as well as temporary trenching, etc.;


4. No water should accumulate around the ground anchor;


5. Ground anchors are not allowed to be installed in the forward direction along the embedded parts

Earch Anchor,Duckbill Earth Anchors,Auger Ground Anchors,Heavy Duty Earth Anchors

Shijiazhuang Qiancen Industry Co.,ltd , https://www.yylpaper.com