Customized wardrobes need to know nine steps to prepare for your purchase of your favorite wardrobe

[ Chinese wardrobe net ] The wardrobe is used frequently in people's daily life, and can be customized to the wardrobe that suits their own wishes, so every day is pleasant. Customized wardrobes actually have a lot of things to pay attention to. If you don't pay attention, you may fall into endless troubles. What are the precautions for custom wardrobes? Let's take a look!

Step1 Clear requirements

Defining the space where the wardrobe is placed, the required storage functions, and the decoration style of the home.

Step2 Choose brands and products

At present, there are many brands of custom-made wardrobes on the market, and try to choose products of well-known brands within the range that the price can withstand. In addition, the wardrobe is of various types, mainly divided into a cloakroom and a sliding door wardrobe. The cloakroom has a U-shaped cloakroom, an L-line cloakroom, and a type of cloakroom. The functional area is divided into a hanging area, a lattice rack, a trousers rack, a pull basket, and a stack. When placing products, drawers, etc., when selecting products, consumers should choose the appropriate styles according to the situation of the space, combined with the style of home decoration and the demand for storage.

Step3 Measure the size of the door

After determining the brand and product design, custom closet business will come the amount of size, to determine the exact wardrobe and production design paper.

Step4 Go to the store to choose the style and color

After the initial test is completed, you need to personally go to the store to select the style of the sliding door and the color of the wardrobe. The colors and styles selected are generally selected according to the style or color of the product, or according to the wardrobe or sliding door. Style to select other main products.

Step5 out of the design

After about 1-3 days, the designer will make a design plan and specific quotation according to the needs. The consumer can be adjusted and finally confirmed if he is not satisfied with the design.

Step6 Confirm the drawings and sign the contract

The design plan was confirmed, and the contract with the merchant should be signed. At present, the pricing method is mainly based on the expanded area, combined with the functional structure calculation, and the pricing is relatively complicated. It is best for consumers to carefully compare each item and retain the design drawings and detailed data.

Step7 delivery factory production

After the drawings are confirmed, the orders and drawings will enter the factory and officially start production. The production cycle is generally 15 to 45 days depending on the off-season season. Generally, the second half of the year is longer than the first half of the year. Consumers must anticipate production time and freight time in advance when renovating.

Step8 home installation

After the production of the wardrobe, the merchant will inform the consumer to pay the balance and agree on the time of installation. When the staff is installed, they should refer to the previous design drawings to check whether they are the same. Whether the hardware accessories are complete, pay attention to check whether the seams of the wardrobe are tight, whether the sliding door is smooth or not, etc. If there is any problem, it should be reflected in time and solved on site.

Step9 After-sales service

At present, custom wardrobes are generally guaranteed for one year, cabinet doors and hardware accessories for 3-5 years, and provide lifetime maintenance and service. Each company has a slightly different warranty period.

The general purchase of custom wardrobes has the above 9 processes, from the previous brand selection to the post-installation and product quality, the owners and friends should spend a certain amount of energy, this can effectively ensure the quality of the wardrobe.

Eye Tape

Eye lash Tape

How to use eyelash tap (Micropore Non-woven Eyelash Extention Tape Lash Tape):


1. Clean hands with professional hand sanitizer.

2. Take two sections of waterproof eyelash tape, length 4cm, cross 120 degrees

3. Go to the viscosity of intersections

4. Stick the unglued sides of the lash lift tape onto the eyelashes

5. Curl your upper lashes

6, stick to both sides of the upper eyelid and fix, make sure the upper lashes are completely fixed

7. Take 2 sections of 3cm eyelash extension tape and 2 sections of 3cm waterproof non-woven eyelash tape to remove adhesive tape

8, first stick non-sensitive tape, stick under the lower eyelashes (do not stick to the lower eyelashes)

9. Stick waterproof tape on non-sensitive tape (exposing lower eyelashes)

10. Clearly separate the upper and lower eyelashes to ensure convenient operation when grafting the lower eyelashes

Lash Tape,Eyelash Tape,Eye Lift Tape,Tape For Eye Lift,Lash Extension Tape,Tape For Lash Extension,Eyelash Extension Tape,Eye Makeup Tape

Shenzhen Nanfang Shishang Cosmetic Utensil Co., Ltd. , https://www.sznfssmakeupbrush.com